A19NAG

Billingham A19
Noise Action Group
Formed 6th October 2009 to campaign for the resurfacing of the concrete section of the A19 trunk road at Billingham
Home Page.
History.
Status .
Stockton B C.
Dept Transport.
DEFRA.
Facts and Figures.
Contacts.
Location.
Community Links.
Comments.
Petition.
Downloads.

 

Email A19NAGGERS

 

 

The promise made by Alistair Darling

Dated 2003

TRUNK ROAD IMPROVEMENTS

The Secretary of State for Transport (Mr Alistair Darling)

I am today announcing a range of improvements to the strategic road network that will tackle congestion, improve safety and reduce the impact of traffic noise.

Measures that minimise the effect of traffic on the people who live alongside roads is as important as trying to ensure that people can travel safely and reliably. For this reason we will be installing quieter surfacing on over 60% of the trunk road network, including all concrete stretches, within the period of the 10 year plan.

I am now able to announce the timetable for the resurfacing of all stretches of concrete roads and that within the next four years we will resurface the 26 stretches affecting the largest number of people. The remaining stretches will be resurfaced between 2007 and 2011.

 

Click here for Highways Agency Web Site

The current Secretary of State for Transport is:-
Rt Hon Philip Hammond MP  philip.hammond@dft.gsi.gov.uk

Click here to download the letter sent to Councillor Mick Womphrey dated

13th March 2002 confirming the resurfacing of the A19 at Billingham as part of the 10 year resurfacing plan.

Parlimentary Under Secretary of State

Minister Responsible for the Strategic Road Network:-

RT Hon Mike Penning MP

Tel 020 7944 3084

mike.penning@dft.gsi.gov.uk

North Area Highways Agency
Name
Designation
Email
Roger Wantling
DBFO Manager
Roger.wantling@highways.gsi.gov.uk
Vanessa Gilbert
Regional Director
Vannessa.gilbert@highways.gsi.gov.uk
Mandy Foster
A19 Department’s Representative
Mandy.foster@highways.gsi.gov.uk